Project Name:

INSTALLATION OF NEW CARGO 36” OFFSHORE PIPELINE AND SPM INSTALLATION AT EL-HAMRA TERMINAL

Client:

WEPCO

The purpose of the new pipeline is to load/offload oil between El Hamra tanks and tankers, the new pipeline is capable to handle the transportation of 1,000,000 SBPD and extends for 500 m from El Hamra Onshore Facilities till the Coastal line, then extends offshore for 8500m towards the tie-in point with the new SPM located at approximately 26m water depth. On 15th Aug2017 PMS was awarded from WEPCO the Installation of New Cargo 36” Offshore Pipeline and SPM Installation at El-Hamra Terminal project. PMS scope was trenching and causeway activities, onshore / offshore transportation of the project material and pre commissioning activities. Read more

Project Name:

ZOHR DEVELOPMENT PROJECT - ZOHR PLATFORM (RAMP~UP PHASE) HIRING OF PMS 12 ACCOMMODATION BARGE

Client:

PETROBEL​

Petrobel aims to hire PMS-12 as accommodation barge while working at Zohr Platform where petrobel do hook up activities on Zohr Platfrom.

Project Name:

CHARTERING OF PMS-MAYO FOR ZOHR RUP PHASE

Client:

SAIPEM

Saipem aims to hire PMS-Mayo as a DP-II Survey Vessel

  • 1st Campaign : from 2nd March 2019 to 17 June 2019.
  • 2nd Campaign : From 23 August 2019 to  12 October 2019.

Project Name:

GPC SERVICE AGREEMENT

Client:

GPC

  • Hook up activities on GPC Platforms.
  • Inspection & Maintenance.
  • Valves , Bolts & O-rings Procurement.
  • Painting & Sand blasting for P/Fs Helidecks.
  • Painting , Sand blasting & Fabrication for flow lines.

Project Name:

CONSTRUCTION OF NEW 12" MAIN OIL PIPELINE AT RAS BUDRAN FIELD

Client:

SUCO

Suco’s plan is to install a new 12″ crude oil pipeline from RB~PPB existing offshore platform in the Gulf of Suez to Ras Budran onshore processing facilities for total approximated lengths of 4.2 km offshore and 300 m onshore, final destination and operational location for the project will be in-between oil production platform RB-PP-B and existing onshore portion of original 12″ main oil-line tie-in point, on 12th November 2018 PMS was awarded from Suez Oil Company “SUCO” the construction of new 12″ main oil pipeline at Ras Budran field project.

Project Name:

SOUTH RAMADAN SRM 2 REHABILITATION (PHASE 2)

Client:

SOROCO

  • Diving Activities by PMS-42.
  • Braces 4” , 8” & 12” Fabrication.
  • Maintenance activities on P/F (Flow Line & Mezzanine Deck  touch up and safety net replacement).
  • Maintenance activities for 8” riser.

Project Name:

CONSTRUCTION WORKS OF SHORE PROTECTION FOR NIDOCO 6 & 11 WELL AREA

Client:

PETROBEL

  • NIDCO 6 & NIDCO 11 assets protection by constructing no of 4 causeway (groins)  at NIDCO 6 and no of 4 causeway (groins)  to eliminate shore erosion.

Project Name:

EXPANSION OF THE THIRD BASIN IN AIN SOKHNA

Client:

Armed Forces Engineering Authority

Establishment of a berth in the port of Adabiya in Ain Sokhna to provide logistics services for oil tankers.