YearProject NameProject ScopeClient
1985Sidi Beshr & El Anfoshy Sanitary Drainage P/L 28" 750mLaying & CommissioningA.S.D.A
1985Production platformsInstallationGEISUM
1984P/L 20" & 6" 42Km/each & 30" 0.6 KmLaying & CommissioningSUCO
1984Two LPG loading P/L mooring facilities at Ras Shokeir 2KmLaying & CommissioningE.G.P.C
1984Submarine P/L 30" 42KmLaying & CommissioningGUPCO
1984Two Ras Badran platformsInstallationSUCO
1983/1984Ras Fanar field development 2InstallationSUCO
1983/1984Water injection platformInstallationPETROBEL
1983/1984Tripod platformInstallationTOTAL
1983/1984Three platforms (A,B,C)InstallationSUCO
1983Two platformsInstallationSUCO
1983Four legs platformInstallationPETROBEL
1983Loading line & B.M 12KmLaying, CommissioningE.G.P.C
1983Loading line & B.M 10KmLaying & CommissioningE.G.P.C
198312" Sea line Ras Seidr 8KmLaying & CommissioningG.P.C
1981Two offshore platformInstallationWEPCO
1978Belayim offshore platforms D10& F10InstallationPETROBEL
19782 Offshores drilling platforms Ras GaraInstallationG.P.C
1977/1978Abu Quir Submarine P/L 14" 10 KmSurvey, Laying & CommissioningWEPCO
1976/1977West Agami Submarine 30" 4 KmSurvey, Laying & CommissioningE.G.P.C.
YearProject NameProject ScopeClient
1990Ras Gara PlatformInstallationPETROBEL
1990NAQ-2 PL ATFORMInstallationWEPCO
1990P/L 8" 10 KmP/L 8" 10 Km Survey, Laying CommissioningPETROBEL
1989October PlatformInstallationGUPCO
1989Two P/L 6" & 8 " 12KmSurvey, Laying CommissioningENPPI
1988Platforms MWP1/ SWP1InstallationGUPCO
1988Two Marine P/L G.G & FF 10KmInstallationG.P.C
1988Offshore P/L 8 " 11 KmSurvey, Laying CommissioningPETROBEL
1988ESSO East Zeit Bay gathering l4"Survey, Laying CommissioningESSO
1987L.P.G. Loading jetty extension Zeit BayInstallationSUCO
1987Repairing 14" damaged P/LRepairWEPCO
19862 North Amer Well production platformsInstallationG.P.C
1986Marine P/L 30 Sadat Berth 8KmSurvey, Laying CommissioningP.P.C
1986Production platform No.4InstallationSUCO
YearProject NameProject ScopeClient
199524" P/L & 18" P/L repairingLaying & CommissioningGUPCO
1995Port Fouad 3", 6", 14" P/Ls 52 Km/ eachSurvey, Laying & CommissioningPETROBEL
1995Tawaila 8" P/L 10.2 KmSurvey, Laying & CommissioningGEISUM
1995Two pipelines 24" 3.7 Km/ eachSurvey, Laying & CommissioningSOPC
1995Port Fouad top side facilityInstallationPETROBEL
1995October Deck PlatformInstallationGUPCO
1995El Sadat JettyInstallationP.P.C
1995Ras Fanar Platform MadiInstallationSUCO
1995Tawella PlatformInstallationGEISUM
1995WEPCO top side fac.InstallationWEPCO
1995Ras Gara PlatformInstallationPETROBEL
1995Port Fouad PlatformInstallationPETROBEL
1994Geisum pipelines 20" 18KMSurvey, Laying & CommissioningGEISUM
1994Helal PlatformInstallationGUPCO
1994Petrobel BMNE&DELInstallationPETROBEL
1994Geisum PlatformInstallationGEISUM
1993Sedki Pipelines 12" & 18" 3 KmSurvey, Laying & CommissioningGUPCO
1993Petrobel Pipelines 4" & 8" 11.7 KmSurvey, Laying & CommissioningPETROBEL
1993VIEPCO 6" 12.5 KmSurvey, Laying & CommissioningWEPCO
1993Ras Fanar 12 " 10 KmSurvey, Laying & CommissioningSUCO
1993Marine Cable& 8"P/L3 KmSurvey, LayingGUPCO
1993LPG Transgulf 12" 11.2 KmSurvey, Laying & CommissioningE.G.P.C
1993Transgulf PlatformInstallationE.G.P.C
1993MWP3 & MPW4InstallationPETROBEL
19928" Gemsa P/L 20 KmSurvey, Laying & CommissioningBAPETCO
19926" Geisum P/L 12KmSurvey, Laying & CommissioningGEISUM
1992Belayim 6" & 10"/ 8Km/eachSurvey, Laying & CommissioningPETROBEL
1992Sidki PlatformInstallationGUPCO
1992Ashrafey PlatformInstallationAGIBA
1991October F to October P 8"4KmSurvey, Laying & CommissioningGUPCO
1991Morgan 24" 36 KmSurvey, Laying & CommissioningGUPCO
1991Helal P/L l2KmSurvey, Laying & CommissioningGUPCO
1991Gemsa P/L 10 Km 8"Survey, Laying & CommissioningBAPETCO
1991Ras Gara P/L 8" & 10" 22KmSurvey, Laying & CommissioningPETROBEL
1991North Geisum field developmentInstallationGEISUM
1991Gemsa PlatformInstallationGEMSA
YearProject NameProject ScopeClient
1998/1999Happy PlatformInstallationGUPCO
1998/1999Rosetta PlatformInstallationZAFARANA
1998/1999Water Injection platformInstallationPETROBEL
199816" Port Fouad P/L 12.3 KMSurvey, Laying & CommissioningPETROBEL
1998Darfeil P/L 36 50 KMSurvey, Laying & CommissioningPETROBEL
1998
Baltim P/L 12 4 KMSurvey, Laying & CommissioningPETROBEL
1998Port Fouad P/L 16 12.3 KMSurvey, Laying & CommissioningPETROBEL
1998Darfeil PlatformInstallationPETROBEL
1998ASHRAFI PlatformInstallationAGIBA
1998SUEZ PlatformInstallationSUEZ PETROLEUM CO.
1998Darfeil top side facilitiesInstallationPETROBEL
1997/1998Platform Maintenance WorksFabrication & InstallationPETROBEL
1997/1998Darfeil PlatformInstallationPETROBEL
19976" P/L from Nidco (9) to Nidco (6) 18" KmSurvey, Laying & CommissioningPETROBEL
1997Morgan P/L 18" KmSurvey, Laying & CommissioningPETROBEL
199726 /16" inch Marine P/L TransgulfSurvey, Laying & CommissioningGASCO
1997Port Said -Eyoun Moussa 36"/ 40 KmSurvey, Laying & CommissioningGASCO
1997Port Fouad FacilitiesInstallationPETROBEL
1997East Tank A platformInstallationGUPCO
1997Ashrafi Platform MaintenanceInstallationAGIBA
1997Semman Monopod Platform & Deck FabricationInstallationPETROBEL
1997Ras Gharib PlatformInstallationG.P.C
1997October FlareInstallationGUPCO
1997Pool-V. contract DevlopmentInstallationPETROBEL
1997Monopode FabricationInstallationPETROBEL
1997Baltim PlatformInstallationPETROBEL
1996Darfeil 10" & 3' 6.5 Km/ eachSurvey, Laying & CommissioningPETROBEL
1996Baltim 8" 9 KmSurvey, Laying & CommissioningPETROBEL
1996Wakar P/L/ 10", 4", 3" 17.8/ eachSurvey, Laying & CommissioningPETROBEL
1996Water injection 8" 2xl.2 Km & 12" 3.6 KmSurvey, Laying & CommissioningPETROBEL
1996Two pipelines 24" 3.7 Km/ eachSurvey, Laying & CommissioningSOPC
1996Nidoco Platform 90tonSurvey, Laying & CommissioningPETROBEL
1996Darfeil (1) Platform 90tonSurvey, Laying & CommissioningPETROBEL
1996Baltim Platform 160tonSurvey, Laying & CommissioningPETROBEL
1996Waker PlatformSurvey, Laying & CommissioningPETROBEL
YearProject NameProject ScopeClient
2005Anshoga 18” P/L (6 Km), 3” P/L, 4” P/L, 10” P/L, 24” P/LSurvey, Laying & CommissioningPETROBEL
2005Essma 8” P/L (8.7 Km), 18” P/L (1.4 Km)Survey, Laying & CommissioningGUPCO
2005Al-Hamad 8” P/L (1.9 Km)Survey, Laying & CommissioningGPC
2005Anshoga Tripod JacketInstallationPETROBEL
2005Al-Hamad Berthing total weights 985 tonInstallationGPC
2004Temsah 14” P/L (0.5 Km), 6” P/L (0.4 Km), 3”+4”+10” conduit, 24”Survey, Laying & CommissioningPETROBEL
2004Simian/Sapphire 4” P/L (29.6 Km), 4” P/L (25 Km)Survey, Laying & CommissioningBURULLUS
2004Morgan 18” P/L (2.2 Km)Survey, Laying & CommissioningGUPCO
2004Rossetta 20” P/L (11 Km)Survey, Laying & CommissioningRashid
2004Esma 2 8"P/L laying from shoreSurvey, Laying & CommissioningGUPCO
2004Esma 2 18" P/L laying from M-8 to M-55 (1.4 Km)Survey, Laying & CommissioningGUPCO
2004New 18" P/L laying from M-8 to M-36 (2.2 Km)Survey, Laying & CommissioningGUPCO
2004Simian 4" P/L laying from shore to Simian field (2.9 Km)Survey, Laying & CommissioningBURLLUS
2004Simian 10" umbilical conduit from shore to 2.9 kmSurvey, Laying & CommissioningBURLLUS
2004Sapphire 4" P/L laying from shore to Sapphire field (2.9 Km)Survey, Laying & CommissioningBURLLUS
2004Temsah 24" P/L laying from TEMSAH 4 to TEMSAH-NW (5.37 Km)Survey, Laying & CommissioningPETROBEL
2004Barbony 26"P/L laying to Nouras –A PLEM (16.87 Km)Survey, Laying & CommissioningPETROBEL
2004Temsah Borfouad MonopodInstallationPETROBEL
2004Rossetta Jacket, DeckInstallationRashid
2004Simian, Sienna and Sapphire Jacket and Deck (Platform)InstallationTechnip/ BURULLUS
2003Morgan 18” P/L Laying From M-8 To ShoreSurvey, Laying & CommissioningGUPCO
2003Edfu 12” P/L Laying From M-36 To EDFUSurvey, Laying & CommissioningGUPCO
2003Edfu 8” P/L Laying From M-36 To EDFUSurvey, Laying & CommissioningGUPCO
2003PETROBEL 18” P/L Laying From MWP-1 To Shore (10 KM)Survey, Laying & CommissioningPETROBEL
2003Nourse 26” Sea Laying From Darfeel-A To Plem (9 KM)Survey, Laying & CommissioningPETROBEL
2003Trench For 26” Saline From Shore To RPPConstructionPETROBEL
2003PETROBEL 26” ,12” ,3” Pipe laying ( 55 Km )Survey, Laying & CommissioningPETROBEL
2003Zeitco Laying Tow 8" Pipelines Form Platform "A" & "C".Survey, Laying & CommissioningZEITCO
2003Petrobel RPP JacketInstallationPETROBEL
2003Helal Project PlatformRepairGUPCO
2003SUCOBoat Landing & Conductor RepairSUCO
2003S.O.P.C DolphinRepairS.O.P.C
2003GEISUMExtension & Stair Way ModificationGEISUM
2003Zeitco Jacket and Deck (Platform)InstallationZEITCO
2002/2003Amer 2, Amer7 6" PipelinesShore Pulling & LayingGPC
2002Edfu Platform & Subsea PlatformInstallation of 12" Production Line.
Installation of 12" Gas Pipeline.
Installation of 8" Water Injection.
GUPCO
2002Gulf of Aqaba Pipeline CrossingSea–Bed & Geotechnical SurveyE.G.C
2002Brullus P/L 36”, 24”, 10", 6", 4". 23 km lengthSurvey & LayingBRULLUS
2002Port Fouad South West Development ProjectPlem & Hot Tap Protection InstallationPETROBEL
2002Port Fouad South West KarousPower upgradingPETROBEL
2002Edfu & Subsea PlatformInstallationGUPCO
2002West Akhen Jacket & DeckInstallationGUPCO
2001Port Fouad South West 12” & 3” Sea lineLayingPETROBEL
2001Akhen 14”/3” Piggyback P/L & 6” - 21 km length eachSurvey & LayingGUPCO
2001Akhen Risers 6” & 4”RepairGUPCO
2001October P/LRepairGUPCO
2001Esma 8”/3” Piggyback P/L from shore to Moss II structure 12 km lengthSurvey & LayingGUPCO
2001Ramadan 1 to Ramadan 4, Water injection P/L 3 km lengthSurvey & LayingGUPCO
2001Morgan 8 -18” P/L 20 km length Survey & LayingGUPCO
2001Port Fouad South West DeckInstallationPETROBEL
2001Edfu Deck RemovalGUPCO
2001Ashrafi PlatformModificationAGIBA
2001Esma Platform (Moss II)InstallationGUPCO
YearProject NameProject ScopeClient
2010WDDM Phase VII offshore developmentBeach pull and laying for 36" P/L (28 km)BURULLUS
2010AL-Khafji FDP Phase 1Laying for 7 pipelines with total length 113,1 km -
Laying of 31 Cables with total length 50 km
AL-KHAFJI JOINT OPERATIONS
2010Maintain Potential Facilities Phase IVLaing for 17 pipelines with total length 78,5 km -     Laying for 10 Cables with total length 58,9 km.SAUDI ARAMCO
2010AL-Khafji FDP Phase 1Transportation & Installation of 6 platformsAL-KHAFJI JOINT OPERATIONS
2009SWGEZ Field Development 8" P/L (9 km)Laying & CommissioningFANPETCO
2009Shoab Gharab 4" P/L (0.8 km)Laying & CommissioningGPC
2009Al Hamad 12" P/L (2.2 km)Laying & CommissioningGPC
2009SWGEZ Field Development SWGEZ-2 PlatformLaying & CommissioningFANPETCO
2009PFSE-2 Bis DeckLaying & CommissioningPETROBEL
2008Theka 8" P/L (3.15 km) - 16" P/L (46.7 km) - 8" P/L (0.9 km)
Laying & CommissioningPETROBEL
2008Theka Deck weight 440 Ton - Theka-2 Deck weight 440 Ton
Laying & CommissioningPETROBEL
2007Dennis 32” P/L (60 Km)Laying & CommissioningPETROBEL
2007Saqara 16” P/L (12.5 Km)Laying & CommissioningGUPCO
2007Taurt 20” P/L (32 Km), 3” P/L (1.5 Km)Laying & CommissioningGUPCO
2007Rossetta Phase III 10” P/L (1.5 Km), 10” P/L (1.2 Km)Laying & CommissioningBURULLUS
2007Semaan Deck weight 550 tonTransportation & InstallationPETROBEL
2007Saqara Jacket weight 270 ton, Deck 538 tonTransportation & InstallationGUPCO
2007TAO Deck 415 tonTransportation & InstallationNOSPCO
2006NODOC 4.5” Cable (3.5 Km)LayingPETROBEL
2006Semaan 18” P/L (18.6 Km)Laying & CommissioningPETROBEL
2006CGOS 12” P/L, 20” P/LLaying & CommissioningGUPCO
2006Trunk Line 20" P/LLaying & CommissioningGUPCO
2006ONS 22” P/L (61.5 Km)Laying & CommissioningNOSPCO
2006Ashrafi 8” P/L (17.8 Km)Laying & CommissioningAGIBA
2006North Ashrafi 8” P/L (9 Km)Laying & CommissioningAGIBA
2006Sabbora 16” P/L (3.7 Km)Laying & CommissioningAGIBA
2006Noras-B Deck weight 148 tonTransportation & InstallationPETROBEL
2006Semaan Tripod platform 258 tonTransportation & InstallationPETROBEL
2006Duba Berthing total weights 3000 tonTransportation & InstallationARAMCO
YEARProject NameProject ScopeClient
2015Offshore Crane re-installationTransportation & installation of pedestal crane on Platform AZEITCO
2015Annual Maintenance agreement for offshore platformsPlatforms maintenance & repairGPC
2014/2015Muzhil oil field Development Project- Transport and install a new Jacket and deck in Muzhil field (Gulf of Suez).
- Laying of 2 new pipelines 8" & 10" P/L.
- Perform Pre/Post survey activities.
- Hydro test for both pipelines.
- Perform a trench
PETROZENIMA
2014Hiring of DP2-Barge PMS-17Hiring for one yearGUPCO
2014Annual Maintenance agreement for offshore platformsPlatforms maintenance & repairGPC
2013ENGINEERING ACTIVITIESENGINEERING ACTIVITIESMARIDIVE
2013Dekka Offshore Development Project Subsea spools , Plem installation, hot tapping and pre-commissioning activities for WP-01 & WP-02PETROBEL
2013Deka Offshore Development Project- Survey
- Offshore Transportation.
- Laying of Port Fouad 10” pipeline.
- Pipeline Commissioning.
PETROBEL
2013Annual Maintenance agreement for offshore platformsPlatforms maintenance & repairGPC
2012Belayim14"RLP/PP-3 AND 6" M-2/RLP Laying of 14" P/L and 6" P/L Riser and spools installationPETROBEL
2012Seth Docking Piles measurements+ foot- print rectification worksDiving ActivitiesIMPERSUB
2012Subsea activities at Rosetta fieldUmbilical repairRASHPETCO
2012Subsea spools installation and platform transportation- Transportation & Installation of 8” & 18" Subsea Spools. Package.
- Transportation of a Jacket & Deck.
GUPCO
2012P/L laying of NAQ Pll & A/Q P1 16"P/L laying of NAQ Pll & A/Q P1 16"ABU QIR PETROLEUM
2011Denise - B Development ProjectHook-up activitiesPETROBEL
2011GOS SIDKI 18" Oil P/L repair- Repair of 18" oil leak @ Sidki Platform.
- Replace 50m of pipes from the landfall point.
GUPCO
2011Deck offshore welding and helideck installation of NAQ-PII- NAQ-PII Deck legs welding.
- Helideck and ship loose items installation.
ABU QIR PETROLEUM
2011Seth offshore development project- Laying of 16 "sea line.
- PLEM & SSIV installation.
- 16" P/L subsea spools final tie-in & umbilical installation.
PETROBEL
2011MD 300 dataENGINEERING ACTIVITIESMARIDIVE
2011Beach pull and Laying of the piggy back 24" /4" P/LBeach pull and Laying of the piggy back 24" /4" P/L 16.6 km between ALAMAL A PF and shore.ALAMAL
20118” Pipe laying Laying of 8” P/L 1.4 km between ALAMAL A PF – ALAMAL BALAMAL
2011Installation of PF ALAMAL A deck extension.Installation of PF ALAMAL A deck extensionALAMAL