ZOHR Field Dev. (Phase 1)

ZOHR Field Dev. (Phase 1)


     

Main Client:

PETROBEL

Contractor:

SAIPEM

Sub-Contractor:

PMS

Project Name:

ZOHR Field Dev. (Phase.1)

Execution date:

10/2016 to 12/2017

Location:

Port said

Cofferdam construction:

- Two causeways of 540m length & 10m width each

- Driving 1800 Sheet piles with lengths of 12m, 18m & 24m.

- Excavating trench of 540m length & 20m width

Reinstatement of work site:

Removing causeways, Recovering Sheet piles & back filling of the trench

Laying Activities for the following P/Ls:

8 inch P/L 39Km length, 14 inch P/L 31.5Km length & 26 inch P/L 19.5Km length.
Automatic welding was applied. International pipe laying rates were achieved.